Early-phase LED decisions
Late pitch/cabinet choices break cable shafts and framing. Survey notes mark area, viewing angles, maintenance platforms and fire-escape conflicts. Real cabinet modules can sit in architectural renders.
NXTIONSTAR — the global standard in visual power.Gaziosmanpaşa / Istanbul
Guides
An LED surface is part of the building envelope and MEP systems. ARLEDSCREEN sizes NXTIONSTAR products with architects and engineers across structure, power and signal.
Late pitch/cabinet choices break cable shafts and framing. Survey notes mark area, viewing angles, maintenance platforms and fire-escape conflicts. Real cabinet modules can sit in architectural renders.
Outdoor LED needs wind and dead-load calcs; indoor walls need substrate capacity. Steel/aluminium interfaces follow cabinet mount points. Waterproofing, thermal movement and service voids go into detail drawings.
Peak power and three-phase balance feed the electrical design. Rear ventilation may be required. Fiber for long runs, CAT6A for short; critical spaces get spare sender/receiver topology. AI/media ports and latency budgets are added when needed.
Quotes include preliminary BOM, power outline, signal diagram and install notes — one desk coordinating GC, electrical and AV from Gaziosmanpaşa.
Ideally before detailed design or tender packs. Late calls force framing revisions and cost.
As estimated kg/m² for cabinet + frame + cabling; structural engineers fold it into load calcs. Final numbers depend on product and mount.
Yes — transparency vs daytime readability is chosen with the concept. See the shopfront guide for detail.
Share drawings or dimensions — we reply with framing, power and signal outline.