Early-phase LED decisions
Late pitch/cabinet choices break cable shafts and framing. Survey notes mark area, viewing angles, maintenance platforms and fire-escape conflicts. Real cabinet modules can sit in architectural renders.
NXTIONSTAR — мировой стандарт визуальной силы.
Руководства
An LED surface is part of the building envelope and MEP systems. ARLEDSCREEN sizes NXTIONSTAR products with architects and engineers across structure, power and signal.

Late pitch/cabinet choices break cable shafts and framing. Survey notes mark area, viewing angles, maintenance platforms and fire-escape conflicts. Real cabinet modules can sit in architectural renders.
Outdoor LED needs wind and dead-load calcs; indoor walls need substrate capacity. Steel/aluminium interfaces follow cabinet mount points. Waterproofing, thermal movement and service voids go into detail drawings.
Peak power and three-phase balance feed the electrical design. Rear ventilation may be required. Fiber for long runs, CAT6A for short; critical spaces get spare sender/receiver topology. AI/media ports and latency budgets are added when needed.
Quotes include preliminary BOM, power outline, signal diagram and install notes — one desk coordinating GC, electrical and AV from Gaziosmanpaşa.
Ideally before detailed design or tender packs. Late calls force framing revisions and cost.
As estimated kg/m² for cabinet + frame + cabling; structural engineers fold it into load calcs. Final numbers depend on product and mount.
Yes — transparency vs daytime readability is chosen with the concept. See the shopfront guide for detail.
Share drawings or dimensions — we reply with framing, power and signal outline.
Published USD prices for 12 panel models (e.g. P1.25 GOB 115.06 USD) are on our price list. VAT included; freight/installation excluded; no free shipping.